News
March 25, 2022 – UPDATE
The following updates have been made for the bidder’s library:
1. Documents replaced in their entirety to supersede the previous edition:
• COMET Website
- COMET Forecast - Supplemental Information Rev B
- NAII 2190.1 H NASA Export Control Program Operations Manual
- NASA SP-20210010952-NASA_HSI_Handbook November 01, 2021
- NPD 8910 D Care and Use of Animals
- NPR 2810.1 F Security of Information and Information Technology
- NPR 2841.1 NASA Identity Credential and Access Management (W/CHANGE 2)
- NPR 7120.5 F NASA Space Flight Program Project Management Requirements
- NPR 8910.1 D Care and Use of Animals
- NRRS 1441.1 NASA Record Retention Schedules (October 15, 2021)
- KDP-KSC-P-3339 Information Technology Acquisition Management ITAM Process for Information Technology IT Good or Services Rev A
- KNPR 1440.6 KSC Records Management Programs Rev D
- KNPR 1840.19 KSC Industrial Hygiene Programs Rev D-1
- KNPR 1860.1 KSC Ionizing Radiation Protection Program Rev C
- KNPR 1860.2 KSC Nonionizing Radiation Protection Program Rev C-1
- KNPR 2570.1 KSC Radio Frequency Spectrum Management Procedural Requirements Rev D
- KNPR 8700.2 KSC System Safety and Reliability Analysis Procedural Requirements Rev A3
- KNPR 8719.9 Examination and Licensing of KSC Operators of Special and Heavy Equipment Cranes and Hoists Rev B-1
- KSC-PLN-2807-Notification Safety and Mission Assurance Mishap Notification - Rev C
- TOSC Collective Bargaining Extension Agreement
- Shifting Profile (Rev B)
- K0000111995_SPC-SBLD SDD
- K0000112995-SPC SCCS System Design Document Vol 1 Rev P
- K0000136630-PLN E2E CC HW Assurance Plan Rev E
- K0000137694-PLN SCCS CMP (3) Rev C
- K0000064476-PLN SDP Vol1 Rev GGC
- K0000143172-PLN SDP Vol2 Rev G
- K0000143173-PLN E2ECC SDP Volume 3 GSE Subsystem Software Rev C
- K0000435411-PLN E2E CC SDP Volume 8 EGSSim Rev_A
- ESD 10020 ESD Certification of Flight Readiness (CoFR) Plan, Revision G
- GSDO-EPD-1201 EGS Program Emergency Procedure Document - Launch Control Center Rev B
- GSDO-ICD-1250 Appendix A - ML to VAB Interfaces Rev E
- GSDO-ICD-1250 Appendix B - ML to Pad Interfaces Rev E
- GSDO-ICD-1250 Appendix C - ML to CT Interfaces Rev E
- GSDO-ICD-1250 Appendix D - ML to Parksite Interfaces Rev E
- GSDO-ICD-1250 Appendix E - ML to VAB Interface Dwgs Rev E
- GSDO-ICD-1250 Appendix F - ML to LC39B Interface Dwgs Rev E
- GSDO-ICD-1250 EGS Program Element-to-Element ICD REV E
- GSDO-PLN-1083 Mishap Preparedness and Contingency Plan
- GSDO-PLN-1145 EGS Program-to-Orion MPCV Program Bilateral Software Hardware Exchange Agreements, Lists, and Schedules (BSHEALS) Rev-AP
- GSDO-PLN-1154 EGS Program to Orion MPCV Program BDEALS Rev-AK
- GSDO-PLN-1242 EGS Program Payload Integration Plan Rev-B
- GSDO-PLN-1261 EGS Post-Flight Assessment Plan Rev A
- GSDO-PLN-1232 Cross Program Quality Planning Requirements Document Plan
- GSDO-RQMT-1256 EGS Program Operational Safety Requirements Rev D
- Schedule Overview-Revised 032422
- SSP-30234 Failure Modes and Effects Analysis and Critical Items List Requirements for Space Station Rev H-1
- SSP 30237 Space Station Electromagnetic Emission and Susceptibility Requirements Rev T
- SSP 30238 Space Station Electromagnetic Techniques Rev E
- SSP 30243 Space Station Requirements for Electromagnetic Compatibility Rev N
2. Documents that are new to the bidder’s library:
- Artemis future mission hardware processing durations
- NPR 2810.7 Controlled Unclassified Information
- NPR 1620.2 Facility Security Level Determination
- GSDO-PLN-1076-ANX-01 Cross Program OMRS Management Plan Rev_F1
- GSDO-PLN-1129-ANX-01 Integrated Launch Operations Implementation Plan: Annex 01: Launch Control Team Firing Room Seating Plan
- GSDO-PLN-1229 EGS Sustaining Engineering Plan
- GSDO-PLN-1244 EGS Program Export Control Plan
- GSDO--SPEC-1290 EGS Program Technical Operating Procedure Requirement
- K0000112994-PLN, Ground Elements Command Control and Communications Project LCS Build Plan
- GSDO-ANA-1056 System Safety Assessment Report Rev F
- GSDO-SPEC-1262 EGS Program Engineering Model Delivery Standard Rev Baseline
- GSDO-EPD-1312 EGS Emergency Procedure Naval Base San Diego Ship and Mole Pier Processing Areas Rev Baseline
- K0000118138-SPC Spaceport Command and Control System (SCCS) Project; System Design Document (SDD) Volume 2 Rev L
- GSDO-PLN-1002-EGS Program SEMP System Acceptance Review Operational Readiness Review Plan ANX-07_Rev_D
- SSP 50902-Rev B SSCD 16111-1 Transportation Integration Office Certification of Flight Readiness Implementation Plan
- KPL-PLN-50008 Payload Facility Contamination Control Implementation Plan
3. Documents that are no longer applicable to COMET:
- COMET Website
- NID 1600.55 Sensitive But Unclassified SBU Controlled Information
- NID 2810.135 Controlled Unclassified Information
- GSDO-PLN-1044 EGS Reliability Maintainability and Availability
- SP 50110 Multi Increment Manifest (MIM) Document
- K0000136629-PLN E2E CC SW Assurance Plan
- GSDO-PLN-1231 EGS Quality Assurance Surveillance Plan
- GSDO-PLN-1313 EGS Program Strategic Technology Infusion Management Plan
NOTE: Some content on this site requires registration and log-in. If you have not yet registered, please visit the Registration menu item on the left.